Genesee 167 Acre Solar Farm - Flint, Michigan


Beginning in 2024, J. Ranck Electric Inc. (JRE) was contracted by North Star Clean Energy, for minor procurement and construction of a 48MW DC/ 40MW AC array to expand their Michigan solar generating portfolio. JRE contracts included the installation of AC and DC electrical work including the installation of inverters, transformers, equipment piles and racks, and collection systems. Work also included building a 34.5kV Substation interconnecting to 138kV substation.


  • Posts - 15,115

  • Racking – Gamechange Tracking System - 1,184 rows

  • Drive system – 1,184

  • Saddle Brackets – 14,321

  • Row Tubes – 9,633

  • Speed Clamps – 85,854

  • Modules installed – 83,486

  • Sungrow model SG4400 UD Inverters - 11

  • Charging modules and Nodes – 1,184

  • Linear Footage of DC Cable – 370,000’

  • Linear Footage of MV Cable – 71,460’

  • Linear Footage of FO Cable – 21,657’

  • Linear Footage of Silt Fence – 38,703’

  • Linear Footage of Access Roads – 10,348’

  • Linear Footage of Vegetation Buffer – 8,800’

  • Weather stations – 4



Comments


Commenting on this post isn't available anymore. Contact the site owner for more info.

© J. Ranck Electric, Inc.

1993 Gover Pkwy
Mt Pleasant, MI 48858

About

J. Ranck Electric is a leader in electrical, communication, and renewable energy contracting.

Contact

Phone: (800) 792-3822

Email: info@jranck.com

Current & Former Employee Forms

1095-B form request

Paystub request

bottom of page