65 MW Gratiot Solar
- mmabry361
- Jan 10
- 1 min read
Updated: 6 days ago
Breckenridge, Michigan
Gratiot site 2 square miles — Breckenridge, MI
Size – 64.86 MW DC/ 57.47 MW AC
Key Dates: Engineering start July 2022, picked back up at 90% drawings in September 2024, Construction start April 2025, Commissioning February 2026
Installation included:
Modules – 117,936
Module Rails – 108,112
Posts - 18,428
Racking – NEXTracker Hail Pro Tracking System - 1,495 rows
Slew Drives – 1,495
Bearing Housing Assembly – 15,977
Torque Tubes – 15,977
Tracking Motors and smart modules – 1,495
Power Electronics, Model No. – HEMGEN3 Inverters - 14
Expansion of 34.5kV Substation that is interconnected to a 138kV substation.
Linear Footage of DC Cable – 257,386’
Linear Footage of MV Cable – 74,877’
Linear Footage of FO Cable – 24,959’
Linear Footage of Silt Fence – 52,212’
Linear Footage of Access Roads – 14,186’
Linear Footage of Vegetation Buffer – 5,724’
Weather stations – 4