top of page
20111216_StockPhotography-88.jpg

65 MW Gratiot Solar

  • mmabry361
  • Jan 10
  • 1 min read

Updated: 6 days ago

Breckenridge, Michigan


Gratiot site 2 square miles — Breckenridge, MI

Size – 64.86 MW DC/ 57.47 MW AC

Key Dates: Engineering start July 2022, picked back up at 90% drawings in September 2024, Construction start April 2025, Commissioning February 2026


Installation included:
  • Modules – 117,936

  • Module Rails – 108,112

  • Posts - 18,428

  • Racking – NEXTracker Hail Pro Tracking System - 1,495 rows

  • Slew Drives – 1,495

  • Bearing Housing Assembly – 15,977

  • Torque Tubes – 15,977

  • Tracking Motors and smart modules – 1,495

  • Power Electronics, Model No. – HEMGEN3 Inverters - 14

  • Expansion of 34.5kV Substation that is interconnected to a 138kV substation.

  • Linear Footage of DC Cable – 257,386’

  • Linear Footage of MV Cable – 74,877’

  • Linear Footage of FO Cable – 24,959’

  • Linear Footage of Silt Fence – 52,212’

  • Linear Footage of Access Roads – 14,186’

  • Linear Footage of Vegetation Buffer – 5,724’

  • Weather stations – 4


Comments


Commenting on this post isn't available anymore. Contact the site owner for more info.

© J. Ranck Electric, Inc.

1993 Gover Pkwy
Mt Pleasant, MI 48858

About

J. Ranck Electric is a leader in electrical, communication, and renewable energy contracting.

Contact

Phone: (800) 792-3822

Email: info@jranck.com

Current & Former Employee Forms

1095-B form request

Paystub request

bottom of page