top of page
20111216_StockPhotography-88.jpg

DTE Energy/Ford Research and Engineering Center

  • mmabry361
  • Dec 3, 2025
  • 1 min read

Parking Structure Arrays with Battery Storage – Dearbo

rn, Michigan


J. Ranck Electric, Inc. was selected as the EPC contractor for this unique partnership between DTE Energy and The Ford Motor Company. This system consists of a rooftop array owned and operated by southeast Michigan power supplier DTE Energy on the top of a new six-story parking structures at the Ford Research & Engineering Center in Dearborn. The 750 kilowatt array is connected to Ford’s 15kV campus loop and includes a 125 kilowatt battery storage system that powers electric vehicle charging stations.


Project Details

Completed: May 2021System Size: 865 kW DC / 750 kW AC

Panels: 2,159 Canadian Solar 400 W modules

Inverters: 12 SMA Inverters

Storage: 125 kW/506 kWh Battery Storage System – ConEdison Battery Storage Systems

Panel Claw ballasted racking system13.2 kV Interconnect




Comments


Commenting on this post isn't available anymore. Contact the site owner for more info.

© J. Ranck Electric, Inc.

1993 Gover Pkwy
Mt Pleasant, MI 48858

About

J. Ranck Electric is a leader in electrical, communication, and renewable energy contracting.

Contact

Phone: (800) 792-3822

Email: info@jranck.com

Current & Former Employee Forms

1095-B form request

Paystub request

bottom of page