ARAUCO Particleboard Plant

  • mmabry361
  • Dec 22, 2025
  • 1 min read

New Plant Electrical and Site Distribution - Grayling, Michigan


J. Ranck Electric was contracted to construct the $20 million electrical package at ARAUCO North America’s 150-acre particleboard plant site, main process building, and all outbuildings in Grayling, Michigan. The facility consists of a residual wood and log handing system, wood stage facility, and the main particleboard manufacturing facility with wood flakers and screeners, forming machines, and dryers. At the time of construction in 2018, the plant was the largest continuous single-line particleboard press in North America.


Project Details
  • Installed 58 manholes (7x7x10, approx. 20,000 lbs each)

  • Installed 6,980’ of duct bank including 44,470’ of conduit and 1,175 yards of concrete

  • Standby, and power feeds to major vendor EPS distribution systems

  • Primary and secondary conduit and cabling from utility substation to the buildings gear/panels

  • Small dry type transformers to provide power for lighting, convenience outlets, heating, etc.

  • Switchgear and transformer installation

  • Interior and exterior site lighting

  • Power Motor Control Centers 1 through 9

  • Temporary power and lighting to include the six outbuildings, the two chip storage buildings, and provide temporary heaters


 
 
 

Comments


Commenting on this post isn't available anymore. Contact the site owner for more info.

© J. Ranck Electric, Inc.

1993 Gover Pkwy
Mt Pleasant, MI 48858

About

J. Ranck Electric is a leader in electrical, communication, and renewable energy contracting.

Contact

Phone: (800) 792-3822

Email: info@jranck.com

Current & Former Employee Forms

1095-B form request

Paystub request

bottom of page