top of page
20111216_StockPhotography-88.jpg

MBS International Airport

  • mmabry361
  • Dec 22, 2025
  • 1 min read

New Parallel Taxiway - Freeland, Michigan


In May 2020, J. Ranck Electric was contracted by LA Construction to install lighting, signage, and a 5kV circuit for a new taxiway that added a second connection into and out of the airline terminal ramp to improve airport operations and traffic efficiency. The installation included nearly 9,000′ of 2″ conduit under the paved taxiway shoulder, 855′ of concrete encased duct bank, and 10,878′ of cable. JRE maintained the airport’s active lighting systems through construction and managed the cutover of the new system.


Project Details
  • Installation of 13 In-turf edge lights

  • Installation of 1 mod, 2 mod, & 3 mod signs in pavement

  • Installation of 93 In-pavement edge lights and foundations

  • Installation of 2 Junction can plazas

  • Installation of 13 Electrical junction structures

  • Installation of one aircraft-rated electrical manhole


 
 
 

Comments


Commenting on this post isn't available anymore. Contact the site owner for more info.

© J. Ranck Electric, Inc.

1993 Gover Pkwy
Mt Pleasant, MI 48858

About

J. Ranck Electric is a leader in electrical, communication, and renewable energy contracting.

Contact

Phone: (800) 792-3822

Email: info@jranck.com

Current & Former Employee Forms

1095-B form request

Paystub request

bottom of page