Delta Township Solar

Phase I, II, and II Consumers Energy Solar Farm — Grand Ledge, MI

JRE was contracted to install the posts, racking, and panels for Consumers Energy’s largest solar array. Through a power purchase agreement, the solar energy generating system will provide enough energy to power 3,300 homes for the Lansing Board of Water and Light. Constructed on 190 acres in Delta Township near Grand Ledge, Michigan, Delta Township Solar was the second largest solar facility in the state at the time of commissioning.

Project Details

Overall System Size: 30 MWDC /24 MW AC
Constructed from September 2017 to May 2018
NEXTracker racking system – increasing generation efficiency by nearly 15 percent
35,602 man-hours worked

Delta #1
System Size: 10 MW DC
Panels: (29,160) 340W Trina modules
Racking: 405 racks and motors
Posts: 4,459

Delta #2
System Size: 15 MW DC
Panels: (43,200) 340W Trina modules
Racking: 600 racks and motors
Posts: 6,532

Delta #3
System Size: 5 MW DC
Panels: (14,040) 340W Trina modules
Racking: 195 racks and motors
Posts: 2,149